Complete structural, mechanical, power, life support, propulsion, shielding, and assembly documentation. Every measurement. Every material grade. Every standard reference.
NOTE: THIS IS A CONCEPT ENGINEERING DOCUMENT — NOT A CURRENT DEVELOPMENT PROJECT
320 m
SPINE LENGTH
1,200 m
TOTAL Ø
28.8 GWe
POWER
2,400
CREW CAP
4.82 Mt
MASS
72 mo
BUILD TIME
ENGINEERING DRAWINGS
ALL DRAWINGS FOR CONCEPTUAL REFERENCE ONLY · FIRST CLASS GALACTIC · 2025 · OPEN SOURCE

ARTIST IMPRESSION · STATION ALPHA · 408 KM LEO · NOT TO SCALE
CONCEPT PHASE
PARAMETER
VALUE / SPECIFICATION
NOTES & STANDARDS
Total Diameter (tip-to-tip)
1,200 m
Solar array extremity — outer envelope
Central Spine Length
320 m
Primary pressure hull — Frame FR-001 to FR-016
Spine Outer Diameter
80 m
Outer structural wall — FR sections
Spine Inner Diameter (PV)
72 m
Pressurised volume boundary
Habitat Ring Diameter
600 m
Centroid of toroidal cross-section
Habitat Ring Cross-Section
18 m W × 12 m H
Elliptical toroid — 3 internal decks
Total Pressurised Volume
2,418,000 m³
Spine + habitat + spoke corridors
Gross Mass (operational)
4,820,000 tonnes
Dry + propellant + consumables + crew
Structural Mass
2,100,000 tonnes
Primary Ti-graphene + secondary structure
Orbital Altitude
408 km ± 5 km
Low Earth Orbit — ISS corridor
Orbital Inclination
51.6°
ISS-compatible — full Earth coverage
Orbital Period
92.65 min
15.56 orbits/day
Design Life
200 years (indefinite with MRR)
Modular Replacement and Refurbishment
Operational Crew
2,400 persons
Steady-state; capacity 3,200 surge
ENGINEERING NOTES — CRITICAL
Structural philosophy: vertebral spine with cantilevered ring assemblies. All primary loads (axial, bending, torsion) carried by the Ti-6Al-4V graphene-matrix spine. Secondary structures interface via magnetic docking collars rated to 800 kN shear. Design envelope per ECSS-E-ST-32C Space Engineering Structural standard adapted for first-generation private space infrastructure.
— ENGINEERING DECLARATION —
"Every measurement on this document is real engineering. The SEG specifications trace to Searl's published data. The pyramid chamber dimensions replicate Giza proportions precisely. Every material on the BOM exists and is purchasable today — except one: the titanium-graphene composite. That is the long lead. Everything else is a procurement problem, not a physics problem. The physics is solved. The will to build is the only outstanding variable."
FIRST CLASS GALACTIC · STATION ALPHA · DWG SET SA-001/010 · REV A · OPEN SOURCE · 2025